Ethiopian electric power job Vacancy

Message from the CEO of Ethiopian Electricity
Ethiopia has been able to achieve rapid and continuous global growth in the last two decades. For these
Development Legacies Electricity has played an irreplaceable role.
Ethiopian Electric Power is an office that has been established for nine years. In these years
He was able to perform many tasks in it.
In particular, the construction of power plants is one of the main missions given by the decree to be carried out by the institution
Its main function is to generate electricity from water, wind, solid waste and underground steam (geothermal).
Power Options is developing various power generation projects.
Among these power generation projects in 2009 Officially graduated and started serving
Including the Gibbe III power plant:
The Great Ethiopian Renaissance Dam Project is 92.1 percent of the Koisha Power Plant Project is 61.3 percent.
500 KV Ethio-Kenya and 400 KV Kenale Dawa III High
The construction of electric power transmission lines has been completed and has started to be put into service.

Join us on Telegram


Also, a significant share in helping the generated electricity to enter the national energy grid
They have many high power transmission lines and power distribution projects
They are under construction.
Besides meeting the country’s energy needs, by supplying the surplus electricity to the foreign market
In addition to making it possible to earn a significant amount of foreign currency, the continental economy will be better connected
It will increase his contribution.
By performing these and many other activities, our institution has the goal of increasing electricity supply
He was able to achieve at a high level. Therefore, our institution started and unfinished activities better
To increase the power generation capacity of the current 5,200 megawatts
He is making great efforts.
Especially in the field of energy development, both domestic and foreign investors with the government and private investors
Public private partnership mediation, policy and law
Frameworks are prepared and approved by the Council of Ministers and the Council of Representatives for implementation
done.
Therefore, the implementation of this system will create more capacity for the energy development sector
To make the transfer of developed and rich knowledge and technology to the developers of the country and abroad
It is believed to buy.
Accordingly, thirteen power generation projects were selected by the Public-Private Partnership (PPP) Board
Six of the thirteen solar projects have been approved for tender. And the rest
Similarly, they will be submitted to the Mega Board for approval.
Next, by conducting detailed studies required for the development of wind power projects, sufficient wind power
Identifying, scanning and preliminary studies of available jobs (Reconnaissance and feasibility
studies) as well as preparation of tender documents are underway.
Therefore, to achieve this broad plan, all the leaders and employees of the institution need what the institution needs
An institution that continuously learns and grows by adopting a corporate business mindset and establishing a modern system
I would like to emphasize that we need to work hand in hand to build.

Leave a Reply

Your email address will not be published. Required fields are marked *